Extension of Metro Line 5 of Madrid
Extension of Madrid Metro Line 5 from Alameda de Osuna to terminals T1-T2-T3 at Adolfo Suárez - Madrid Barajas airport, where a connection to Madrid Metro Line 8 will be established.
- Fund:
- FEDER
- Period:
- 2021 - 2027
- Location:
- Comunidad de Madrid
- Subject matter:
- Operación de Importancia Estratégica | Movilidad urbana sostenible | UE más verde
- Programme:
- Regional Programme Community of Madrid
- Total investment:
- 219.426.605,00 €
- EU aid:
- 87.770.642,00 €
- Start date:
- 01/01/2025
- Date of completion:
- 31/12/2028
Greater versatility for the traveller, being able to cross the city of Madrid from the north-east to the south-west without transhipment, crossing 32 stations, including some in the heart of the city and others even with connections to the Cerca network.Promote sustainable mobility and energy efficiency, digital transformation, economic, social and territorial cohesion, as well as reducing the carbon footprint of the passenger transport system as a whole, and more specifically, the reduction of CO2 and CH4 emissions resulting from the change of mode of transport once the new infrastructure is in place.